|
C. Compton et al., “Production Status of Superconducting Cryomodules for the Facility for Rare Isotope Beams”, in Proc. 18th Int. Conf. RF Superconductivity (SRF'17), Lanzhou, China, Jul. 2017, pp. 928-934. |
|
C. Compton et al., “The Facility for Rare Isotope Beams Superconducting Cavity Production Status and Findings Concerning Surface Defects”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 31-35. |
|
D. Luo et al., “Solenoid/Magnetic Shielding Test Results in FRIB-1&2 Cryomodules”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 607-609. |
|
F. Naito et al., “Study of the ACS Cavity Without a Bridge Cavity”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper TUPP073, pp. 596-598. |
|
H. Ao et al., “Annular-Ring Coupled Structure Linac for the J-PARC Linac Energy Upgrade”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper THPWO036, pp. 3845-3847. |
|
H. Ao et al., “Beam Dynamics Design of J-PARC Linac High Energy Section”, in Proc. 22nd Linear Accelerator Conf. (LINAC'04), Lübeck, Germany, Aug. 2004, paper TUP21, pp. 339-341. |
|
H. Ao et al., “Biperiodic Disk-and-Washer Cavity for Electron Acceleration”, in Proc. 19th Int. LINAC Conf. (LINAC'98), Chicago, IL, USA, Aug. 1998, paper MO4083, pp. 255-257. |
|
H. Ao et al., “Cold-Model Tests and Fabrication Status for J-PARC ACS”, in Proc. 22nd Linear Accelerator Conf. (LINAC'04), Lübeck, Germany, Aug. 2004, paper MOP18, pp. 75-77. |
|
H. Ao et al., “Fabrication and Cold Test Result of FRIB =0.53 Pre-production Cryomodule”, in Proc. 18th Int. Conf. RF Superconductivity (SRF'17), Lanzhou, China, Jul. 2017, pp. 120-124. |
|
H. Ao et al., “Fabrication of Disk-and-Washer Cavity”, in Proc. 1st Asian Particle Accelerator Conf. (APAC'98), Tsukuba, Japan, Mar. 1998, paper 4D042, pp. 187-189. |