JaCoW Logo

Reference Search

Author: B. Bird


References



Reference
C. Compton et al., “Production Status of Superconducting Cryomodules for the Facility for Rare Isotope Beams”, in Proc. 18th Int. Conf. RF Superconductivity (SRF'17), Lanzhou, China, Jul. 2017, pp. 928-934.
H. Ao et al., “Fabrication and Cold Test Result of FRIB =0.53 Pre-production Cryomodule”, in Proc. 18th Int. Conf. RF Superconductivity (SRF'17), Lanzhou, China, Jul. 2017, pp. 120-124.
H. Ao et al., “Installation Progress on FRIB =0.041 Cryomodules Toward Beam Commissioning”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 1087-1089.
H. Ao et al., “Status of =0.53 Pre-Production Cryomodule”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 811-814.
J. Wei et al., “The FRIB SC-Linac - Installation and Phased Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 12-20.
K. Saito et al., “FRIB Solenoid Package in Cryomodule and Local Magnetic Shield”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 235-240.
M. Leitner et al., “Status of the Linac SRF Acquisition for FRIB”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper TUPB040, pp. 564-566.
M. Leitner et al., “The FRIB Project at MSU”, in Proc. 16th Int. Conf. RF Superconductivity (SRF'13), Paris, France, Sep. 2013, paper MOIOA01, pp. 01-10.
M. Xu et al., “FRIB LS1 CryomoduleÔÇÖs Solenoid Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 671-674.
S. J. Miller et al., “Construction and Performance of FRIB Quarter Wave Prototype Cryomodule”, in Proc. 17th Int. Conf. RF Superconductivity (SRF'15), Whistler, Canada, Sep. 2015, paper FRAA06, pp. 1446-1452.


Back to the list