|
T. Xu et al., “MSU RE-Accelerator ReA3 0.085 QWR Cryomodule Status”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper MOPP044, pp. 155-157. |
|
J. Wei et al., “The FRIB Superconducting Linac - Status and Plans”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. XX-XX. |
|
T. Xu et al., “FRIB Cryomodule Design and Production”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 673-678. |
|
J. Wei et al., “Progress towards the Facility for Rare Isotope Beams”, in Proc. North American Particle Accelerator Conf. (NAPAC'13), Pasadena, CA, USA, Sep.-Oct. 2013, paper FRYBA1, pp. 1453-1457. |
|
T. Xu et al., “SRF Development and Cryomodule Production for the FRIB Linac”, in Proc. North American Particle Accelerator Conf. (NAPAC'16), Chicago, IL, USA, Oct. 2016, pp. 847-852. |
|
K. Saito et al., “FRIB Project: Moving to Production Phase”, in Proc. 17th Int. Conf. RF Superconductivity (SRF'15), Whistler, Canada, Sep. 2015, paper MOAA01, pp. 1-13. |
|
H. Ao et al., “Fabrication and Cold Test Result of FRIB =0.53 Pre-production Cryomodule”, in Proc. 18th Int. Conf. RF Superconductivity (SRF'17), Lanzhou, China, Jul. 2017, pp. 120-124. |
|
T. Xu et al., “Progress of FRIB SRF Production”, in Proc. 18th Int. Conf. RF Superconductivity (SRF'17), Lanzhou, China, Jul. 2017, pp. 345-352. |
|
H. T. Ren et al., “Commissioning Status of the FRIB Front End”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 813-816. |
|
H. Ao et al., “FRIB Driver Linac Integration to be ready for Phased Beam Commissioning”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 823-826. |