|
J. Wei et al., “The FRIB SC-Linac - Installation and Phased Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 12-20. |
|
J. Wei et al., “Advances of the FRIB Project”, in Proc. 14th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'18), Lanzhou, China, Oct. 2018, pp. 7-12. |
|
A. C. C. Villari et al., “ReAccelerator Upgrade, Commissioning and First Experiments at the National Superconducting Cyclotron Laboratory (NSCL) / Facility for Rare Isotope Beams (FRIB)”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 101-103. |
|
J. Wei et al., “FRIB Commissioning and Early Operations”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 802-807. |
|
A. C. C. Villari et al., “Upgrade of the FRIB ReAccelerator”, in Proc. North American Particle Accelerator Conf. (NAPAC'22), Albuquerque, NM, USA, Aug. 2022, pp. 572-577. |
|
T. Xu et al., “Completion of FRIB Superconducting Linac and Phased Beam Commissioning”, in Proc. 20th International Conference on RF Superconductivity (SRF'21), East Lansing, MI, USA, Jun.-Jul. 2021, pp. 197. |
|
J. Wei et al., “FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives”, in Proc. 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper MOIAA01, pp. 1-8. |
|
C. Compton et al., “ReA3 - the Rare Isotope Re-accelerator at MSU”, in Proc. 25th Linear Accelerator Conf. (LINAC'10), Tsukuba, Japan, Sep. 2010, paper MO203, pp. 26-30. |
|
J. Wei et al., “FRIB Beam Power Ramp-up: Status and Plans”, in Proc. HB'23 (HB), Geneva, Switzerland, Oct. 2023, paper THC1I2, pp. 351-357. |