JaCoW Logo

Reference Search

Author: A. Ganshyn


References



Reference
D. Luo et al., “Solenoid/Magnetic Shielding Test Results in FRIB-1&2 Cryomodules”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 607-609.
H. Ao et al., “Fabrication and Cold Test Result of FRIB =0.53 Pre-production Cryomodule”, in Proc. 18th Int. Conf. RF Superconductivity (SRF'17), Lanzhou, China, Jul. 2017, pp. 120-124.
H. Ao et al., “FRIB Driver Linac Integration to be ready for Phased Beam Commissioning”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 823-826.
H. Ao et al., “Installation Progress on FRIB =0.041 Cryomodules Toward Beam Commissioning”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 1087-1089.
J. T. Popielarski et al., “Performance Testing of FRIB Early Series Cryomodules”, in Proc. 18th Int. Conf. RF Superconductivity (SRF'17), Lanzhou, China, Jul. 2017, pp. 715-721.
J. Wei et al., “Advances of the FRIB Project”, in Proc. 14th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'18), Lanzhou, China, Oct. 2018, pp. 7-12.
J. Wei et al., “FRIB Commissioning and Early Operations”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 802-807.
J. Wei et al., “FRIB Project Status and Beam Instrumentation Challenges”, in Proc. 6th Int. Beam Instrumentation Conf. (IBIC'17), Grand Rapids, MI, USA, Aug. 2017, pp. 1-7.
J. Wei et al., “FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives”, presented at the 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper MOIAA01, unpublished.
J. Wei et al., “The FRIB SC-Linac - Installation and Phased Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 12-20.


Back to the list