JaCoW Logo

Reference Search

Author: L. Hodges


References



Reference
E. Pozdeyev et al., “FRIB Front End Construction and Commissioning”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 58-62.
H. Ao et al., “Installation Progress on FRIB =0.041 Cryomodules Toward Beam Commissioning”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 1087-1089.
D. G. Morris et al., “RF System for FRIB Accelerator”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 1765-1770.
J. Wei et al., “FRIB Project Status and Beam Instrumentation Challenges”, in Proc. 6th Int. Beam Instrumentation Conf. (IBIC'17), Grand Rapids, MI, USA, Aug. 2017, pp. 1-7.
J. Wei et al., “FRIB Accelerator: Design and Construction Status”, in Proc. 13th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'15), Yokohama, Japan, Sep. 2015, paper MOM1I02, pp. 6-10.
K. D. Davidson, C. Dudley, L. Hodges, and S. Stanley, “Integration Challenges and Solutions for Low Level Controls Systems at the FRIB”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 1348-1351.
J. Popielarski et al., “FRIB Technology Demonstration Cryomodule Test”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper MOPB090, pp. 386-388.
J. Popielarski et al., “FRIB Technology Demonstration Cryomodule Test”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper MOPLB10, pp. 165-167.
T. Xu et al., “MSU RE-Accelerator ReA3 0.085 QWR Cryomodule Status”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper MOPP044, pp. 155-157.
L. Popielarski et al., “SRF Highbay Technical Infrastructure for FRIB Production at Michigan State University”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper THPP046, pp. 954-956.


Back to the list