JaCoW Logo

Reference Search

Author: L. Hodges


References



Reference
J. Wei et al., “FRIB Project Status and Beam Instrumentation Challenges”, in Proc. 6th Int. Beam Instrumentation Conf. (IBIC'17), Grand Rapids, MI, USA, Aug. 2017, pp. 1-7.
J. Wei et al., “The FRIB SC-Linac - Installation and Phased Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 12-20.
J. Wei et al., “The FRIB Superconducting Linac - Status and Plans”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. XX-XX.
K. D. Davidson, C. Dudley, L. Hodges, and S. Stanley, “Integration Challenges and Solutions for Low Level Controls Systems at the FRIB”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 1348-1351.
K. Saito et al., “FRIB Project: Moving to Production Phase”, in Proc. 17th Int. Conf. RF Superconductivity (SRF'15), Whistler, Canada, Sep. 2015, paper MOAA01, pp. 1-13.
K. Saito et al., “FRIB Solenoid Package in Cryomodule and Local Magnetic Shield”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 235-240.
L. Popielarski et al., “SRF Highbay Technical Infrastructure for FRIB Production at Michigan State University”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper THPP046, pp. 954-956.
M. Xu et al., “FRIB LS1 CryomoduleÔÇÖs Solenoid Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 671-674.
T. Xu et al., “Completion of FRIB Superconducting Linac and Phased Beam Commissioning”, in Proc. 20th International Conference on RF Superconductivity (SRF'21), East Lansing, MI, USA, Jun.-Jul. 2021, pp. 197.
T. Xu et al., “MSU RE-Accelerator ReA3 0.085 QWR Cryomodule Status”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper MOPP044, pp. 155-157.


Back to the list