JaCoW Logo

Reference Search

Author: D. G. Morris


References



Reference
H. Ao et al., “Fabrication and Cold Test Result of FRIB =0.53 Pre-production Cryomodule”, in Proc. 18th Int. Conf. RF Superconductivity (SRF'17), Lanzhou, China, Jul. 2017, pp. 120-124.
J. T. Popielarski et al., “Performance Testing of FRIB Early Series Cryomodules”, in Proc. 18th Int. Conf. RF Superconductivity (SRF'17), Lanzhou, China, Jul. 2017, pp. 715-721.
T. Xu et al., “Progress of FRIB SRF Production”, in Proc. 18th Int. Conf. RF Superconductivity (SRF'17), Lanzhou, China, Jul. 2017, pp. 345-352.
S. H. Kim et al., “Experience and Lessons in FRIB Superconducting Quarter-Wave Resonator Commissioning”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 646-649.
T. Maruta et al., “Status of Beam Commissioning in FRIB Driver Linac”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 951-953.
H. Maniar, E. Daykin, D. G. Morris, A. S. Plastun, H. T. Ren, and S. Zhao, “Python Scripts for RF Commissioning at FRIB”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 563-565.
H. T. Ren et al., “Commissioning Status of the FRIB Front End”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 813-816.
H. Ao et al., “FRIB Driver Linac Integration to be ready for Phased Beam Commissioning”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 823-826.
S. Zhao et al., “The LLRF Control Design and Validation at FRIB”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 667-669.
J. Wei et al., “The FRIB SC-Linac - Installation and Phased Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 12-20.


Back to the list