JaCoW Logo

Reference Search

Author: D. G. Morris


References



Reference
J. Wei et al., “The FRIB Superconducting Linac - Status and Plans”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. XX-XX.
J. Wei et al., “The FRIB SC-Linac - Installation and Phased Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 12-20.
J. Wei et al., “FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives”, presented at the 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper MOIAA01, unpublished.
J. Wei et al., “FRIB Project Status and Beam Instrumentation Challenges”, in Proc. 6th Int. Beam Instrumentation Conf. (IBIC'17), Grand Rapids, MI, USA, Aug. 2017, pp. 1-7.
J. Wei et al., “FRIB Commissioning and Early Operations”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 802-807.
J. Wei et al., “FRIB Beam Power Ramp-up: Status and Plans”, in Proc. HB'23 (HB), Geneva, Switzerland, Oct. 2023, paper THC1I2, pp. 351-357.
J. Wei et al., “Advances of the FRIB Project”, in Proc. 14th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'18), Lanzhou, China, Oct. 2018, pp. 7-12.
J. W. Lewellen et al., “Status of the SLAC/MSU SRF Gun Development Project”, in Proc. North American Particle Accelerator Conf. (NAPAC'22), Albuquerque, NM, USA, Aug. 2022, pp. 623-626.
J. T. Popielarski et al., “Performance Testing of FRIB Early Series Cryomodules”, in Proc. 18th Int. Conf. RF Superconductivity (SRF'17), Lanzhou, China, Jul. 2017, pp. 715-721.
H. T. Ren et al., “Commissioning Status of the FRIB Front End”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 813-816.


Back to the list