|
J. Wei et al., “FRIB Accelerator: Design and Construction Status”, in Proc. 13th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'15), Yokohama, Japan, Sep. 2015, paper MOM1I02, pp. 6-10. |
|
T. Xu et al., “MSU RE-Accelerator ReA3 0.085 QWR Cryomodule Status”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper MOPP044, pp. 155-157. |
|
K. Saito et al., “Superconducting RF Development for FRIB at MSU”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper THIOA02, pp. 790-794. |
|
L. Popielarski et al., “SRF Highbay Technical Infrastructure for FRIB Production at Michigan State University”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper THPP046, pp. 954-956. |
|
J. Wei et al., “The FRIB Superconducting Linac - Status and Plans”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. XX-XX. |
|
Z. Zheng, J. T. Popielarski, K. Saito, S. Stark, T. Xu, and Y. Yamazaki, “Design and Commissioning of FRIB Multipacting-Free Fundamental Power Coupler”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 767-769. |
|
S. J. Miller et al., “Design of a FRIB Half-Wave Pre-Production Cryomodule”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 795-797. |
|
H. Ao et al., “Status of =0.53 Pre-Production Cryomodule”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 811-814. |
|
Z. Zheng, J. T. Popielarski, K. Saito, and T. Xu, “Cost Reduction for FRIB Magnetic Shielding”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 818-820. |
|
S. Stark et al., “FRIB HWR Tuner Development”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 535-537. |