|
S. J. Miller et al., “FRIB Cavity and Cryomodule Performance, Comparison with the Design and Lessons Learned”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 742-749. |
|
J. Wei et al., “Advances of the FRIB Project”, in Proc. 14th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'18), Lanzhou, China, Oct. 2018, pp. 7-12. |
|
M. Comunian et al., “Status of the SPES Exotic Beam Facility”, in Proc. 14th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'18), Lanzhou, China, Oct. 2018, pp. 13-17. |
|
G. Bisoffi et al., “Hardware Commissioning of the Renovated PIAVE Injector at INFN-LNL”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 949-952. |
|
G. Stinson et al., “COMPLETION OF THE ISAC-I ACCELERATOR FOR RADIOACTIVE IONS AND EXTENSION TO ISAC-II”, in Proc. 2nd Asian Particle Accelerator Conf. (APAC'01), Beijing, China, Sep. 2001, paper THAU03, pp. XX-XX. |
|
J. Wei et al., “FRIB Commissioning and Early Operations”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 802-807. |
|
K. Masuda et al., “Commissioning of IFMIF Prototype Accelerator Towards CW Operation”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 319-323. |
|
T. Xu et al., “Completion of FRIB Superconducting Linac and Phased Beam Commissioning”, presented at the 20th International Conference on RF Superconductivity (SRF'21), East Lansing, MI, USA, Jun.-Jul. 2021, unpublished. |