|
N. Pichoff et al., “The SARAF-LINAC Project 2017 Status”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 2194-2196. |
|
M.-E. Couprie et al., “The Status of LUNEX5 Project”, in Proc. 36th Int. Free Electron Laser Conf. (FEL'14), Basel, Switzerland, Aug. 2014, paper TUP087, pp. 574-579. |
|
M.-E. Couprie et al., “Advances on the LUNEX5 and COXINEL Projects”, in Proc. 37th Int. Free Electron Laser Conf. (FEL'15), Daejeon, Korea, Aug. 2015, pp. 730-734. |
|
N. Pichoff et al., “Discussion on SARAF-LINAC Cryomodules”, in Proc. 61st ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'18), Daejeon, Korea, Jun. 2018, pp. 80-82. |
|
E. Vogel et al., “Integration of the European XFEL Accelerating Modules”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper MOPB017, pp. 207-209. |
|
C. Madec et al., “Status of E-XFEL String and Cryomodule Assembly at CEA-Saclay”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper THPB083, pp. 1017-1019. |
|
C. Madec et al., “Status of E-XFEL String and Cryomodule Assembly at CEA-Saclay”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper THPLB09, pp. 831-833. |
|
S. Barbanotti et al., “Qualification of the Titanium Welds in the E-XFEL Cryomodule and the CE Certification”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper TUPP019, pp. 468-470. |
|
K. N. Nii et al., “Vertical Electro-Polishing of Nb Single-Cell Cavity Using Cathode with Variable-Geometry Wings and Its Results of Vertical Test”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper TUPP101, pp. 662-664. |
|
N. Pichoff et al., “The SARAF-LINAC Project Status”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 38-40. |