|
I. Podadera et al., “Beam Commissioning of Beam Position and Phase Monitors for LIPAc”, in Proc. 8th Int. Beam Instrumentation Conf. (IBIC'19), Malmö, Sweden, Sep. 2019, pp. 534-538. |
|
S. Ishida, P. Cara, H. Dzitko, A. Kasugai, and K. Sakamoto, “Progress of IFMIF/EVEDA Project and Prospects for A-FNS”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 159-163. |
|
T. Ebisawa et al., “Preparation of the Cryomodule Assembly for the Linear IFMIF Prototype Accelerator (LIPAc) in Rokkasho”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 726-729. |
|
K. Kondo et al., “Radiation Measurement in the 1st Beam Commissioning Campaign of the LIPAc RFQ”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 964-967. |
|
Y. Shimosaki et al., “Lattice Design for 5MeV-125mA CW RFQ Operation in the LIPAc”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 977-979. |
|
F. Grespan et al., “IFMIF/EVEDA RFQ Beam Commissioning at Nominal 125 mA Deuteron Beam in Pulsed Mode”, in Proc. 11th Int. Particle Accelerator Conf. (IPAC'20), Caen, France, May 2020, pp. 21. |
|
D. S?ínchez-Herranz et al., “Status of the Engineering Design of the IFMIF-DONES High Energy Beam Transport Line and Beam Dump System”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 2520-2523. |
|
K. Masuda et al., “Commissioning of IFMIF Prototype Accelerator Towards CW Operation”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 319-323. |
|
I. Podadera et al., “Commissioning Plan of the IFMIF-DONES Accelerator”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 330-333. |
|
K. Hasegawa et al., “LIPAc (linear IFMIF prototype accelerator) beam commissioning & future plans”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper MOYD2, pp. 15-20. |