JaCoW Logo

Reference Search

Author: L. Yang


References



Reference
G. M. Wang et al., “Tools for NSLS II Commissioning”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1971-1973.
G. M. Wang et al., “Preparation for NSLS II Linac to Booster Transport Line Commissioning”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper MOPPR094, pp. 1002-1004.
G. M. Wang et al., “NSLS-II Storage Ring Insertion Device and Front-End Commissioning”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1974-1976.
G. M. Wang et al., “NSLS-II Storage Ring Injection Optimization”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1968-1970.
G. M. Wang et al., “NSLS II Injector Integrated Testing”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper THPEA063, pp. 3285-3287.
G. M. Wang et al., “NSLS II Commissioning Tools”, in Proc. North American Particle Accelerator Conf. (NAPAC'13), Pasadena, CA, USA, Sep.-Oct. 2013, paper MOPHO17, pp. 276-278.
G. M. Wang et al., “NSLS II Booster Extended Integration Test”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1977-1979.
G. L. Dou et al., “Status Report on the Cyclotron Injector for HIMM”, in Proc. 23rd Int. Conf. Cyclotrons Appl. (Cyclotrons'22), Beijing, China, Dec. 2022, paper THBI02, pp. 269-273.
G. B. Shen, M. R. Kraimer, and L. Yang, “Prototype of Beam Commissioning Environment and its Applications for NSLS-II”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper WEPEB026, pp. 2740-2742.
F. Zhong, X. Lei, J. Yang, and L. Yang, “Design of the Air Cooling System for the High Voltage Power Supply of a Electron Accelerator”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper MOPWA021, pp. 705-707.


Back to the list