|
S. H. Kim et al., “Experience and Lessons in FRIB Superconducting Quarter-Wave Resonator Commissioning”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 646-649. |
|
T. Maruta et al., “Status of Beam Commissioning in FRIB Driver Linac”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 951-953. |
|
H. Maniar, E. Daykin, D. G. Morris, A. S. Plastun, H. T. Ren, and S. Zhao, “Python Scripts for RF Commissioning at FRIB”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 563-565. |
|
H. T. Ren et al., “Commissioning Status of the FRIB Front End”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 813-816. |
|
H. Ao et al., “FRIB Driver Linac Integration to be ready for Phased Beam Commissioning”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 823-826. |
|
S. Zhao et al., “The LLRF Control Design and Validation at FRIB”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 667-669. |
|
W. Chang et al., “Bunker Testing of FRIB Cryomodules”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 765-767. |
|
J. Wei et al., “The FRIB SC-Linac - Installation and Phased Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 12-20. |
|
W. Chang et al., “Progress in FRIB Cryomodule Bunker Tests”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 1029-1034. |
|
D. M. Ouyang et al., “Research on Alkali Antimonide Photocathode Fabrication Recipe at PKU”, in Proc. 63rd Advanced ICFA Beam Dynamics Workshop on Energy Recovery Linacs (ERL'19), Berlin, Germany, Sep. 2019, pp. 120-122. |