JaCoW Logo

Reference Search

Author: T. Obina


References



Reference
K. Harada, Y. Kobayashi, S. Matsuba, T. Miyajima, S. Nagahashi, and T. Obina, “Fast Local Bump System for Helicity Switching at the Photon Factory”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper WEPC150, pp. 2356-2358.
K. Hirano et al., “Beam Based Measurement of Injection Parameters at KEK-PF”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 4152-4154.
K. Nakamura et al., “Transverse Intra-bunch Feedback in the J-PARC MR”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 2786-2788.
K. Tsuchiya et al., “Present Status of the KEK PF-Ring and PF-AR”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper MOPEA028, pp. 136-138.
M. Iwasaki et al., “Design and Status of the SuperKEKB Accelerator Control Network System”, in Proc. 14th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'13), San Francisco, CA, USA, Oct. 2013, paper THPPC009, pp. 1107-1110.
M. Iwasaki et al., “Design and Status of the SuperKEKB Accelerator Control Network System”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 3150-3152.
M. Katoh et al., “Commissioning of the Photon Factory with a High Brilliance Optics”, in Proc. 1st Asian Particle Accelerator Conf. (APAC'98), Tsukuba, Japan, Mar. 1998, paper 4E101, pp. 271-273.
M. Sato et al., “Commissioning Status of the iBNCT Accelerator”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 164-166.
M. Sato et al., “Commissioning Status of the Linac for the iBNCT Project”, in Proc. 29th Linear Accelerator Conf. (LINAC'18), Beijing, China, Sep. 2018, pp. 174-176.
M. Shimada et al., “Bunch Compression at the Recirculation Loop of the Compact ERL”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 3008-3010.


Back to the list