JaCoW Logo

Reference Search

Author: H. F. Ouyang


References



Reference
S. Wang, S. Fu, H. F. Ouyang, and J. Peng, “The Preparation for the Commissioning of CSNS Accelerators”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper THPWO046, pp. 3872-3874.
T. G. Xu et al., “The Study on Beam Loss Control Based on a High Intensity RFQ”, in Proc. 46th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'10), Morschach, Switzerland, Sep.-Oct. 2010, paper MOPD59, pp. 223-225.
T. M. Huang et al., “The development of a high power input coupler for China ADS injector I RFQ”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper THPWO041, pp. 3857-3859.
Y. L. Chi et al., “Progress of Injector-1 and Main Linac of Chinese ADS Proton Accelerator”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper THPWO040, pp. 3854-3856.
Y. L. Chi et al., “The Development of the H- Ion Source Test Stand for CSNS”, in Proc. 25th Linear Accelerator Conf. (LINAC'10), Tsukuba, Japan, Sep. 2010, paper THP115, pp. 1007-1009.
Y. W. An et al., “The Operation Status of CSNS Front End”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 2024-2026.
Z. Li et al., “Progress on the Physics Design of the C-ADS Injector Scheme I”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper THPWO043, pp. 3863-3865.


Back to the list