|
N. Pichoff et al., “The SARAF-LINAC Project 2017 Status”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 2194-2196. |
|
N. Pichoff et al., “The SARAF-LINAC Project 2018 Status”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 994-996. |
|
N. Pichoff et al., “The SARAF-LINAC Project Status”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 38-40. |
|
N. Pichoff et al., “The SARAF-LINAC Project Status”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 971-973. |
|
O. Piquet et al., “ESS RFQ: Construction Status and Power Couplers Qualification”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 855-857. |
|
O. Piquet et al., “SARAF Equipped Cavity Test Stand (ECTS) at CEA”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 852-854. |
|
P. Hamel et al., “ESS RFQ: Installation and Tuning at Lund”, in Proc. 12th Int. Particle Accelerator Conf. (IPAC'21), Campinas, Brazil, May 2021, pp. 1372-1374. |
|
R. Cubizolles et al., “CEA Preliminary Design of the Cryomodules for SARAF Phase II Superconducting Linac”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 951-953. |
|
W. Wittmer et al., “European Spallation Source (ESS) Normal Conducting Front End Status Report”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 274-276. |