|
S. M. Lidia, “Beam Diagnostics for FRIB Commissioning”, presented at the 11th Int. Beam Instrumentation Conference (IBIC'22), Kraków, Poland, Sep. 2022, paper MO2I1, unpublished. |
|
S. M. Lidia et al., “The FEL Driven Two-Beam Accelerator Studies at CESTA”, in Proc. 20th Linear Accelerator Conf. (LINAC'00), Monterey, CA, USA, Aug. 2000, paper THC07, pp. 869-871. |
|
S. M. Lidia et al., “RK-TBA Studies in Ka-Band”, in Proc. 19th Int. LINAC Conf. (LINAC'98), Chicago, IL, USA, Aug. 1998, paper MO4021, pp. 97-99. |
|
S. M. Lidia et al., “Overview of Beam Diagnostic Systems for FRIB”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 226-230. |
|
S. M. Lidia et al., “Initial Commissioning of NDCX-II”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper MOEPPB005, pp. 85-87. |
|
S. M. Lidia et al., “FRIB Machine Protection System Design and Validation Studies”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 221-225. |
|
S. M. Lidia and S. S. Yu, “Stability of Modulated Beam Transport in Relativistic Klystron Two-Beam Accelerators”, in Proc. 18th Particle Accelerator Conf. (PAC'99), New York, NY, USA, Mar. 1999, paper TUP132, pp. 1800-1802. |
|
S. M. Lidia and R. D. Ryne, “Relativistic Klystron Two-Beam Accelerator Simulation Code Development”, in Proc. 17th Particle Accelerator Conf. (PAC'97), Vancouver, Canada, May 1997, paper 9P106, pp. 2624-2626. |
|
S. M. Lidia and K. Murphy, “Error Analysis for Pepperpot Emittance Measurements Redux: Correlated Phase Spaces”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper WEPF17, pp. 579-583. |
|
S. Eylon et al., “Initial Commissioning Results of the RTA Injector”, in Proc. 18th Particle Accelerator Conf. (PAC'99), New York, NY, USA, Mar. 1999, paper FRA3, pp. 3390-3392. |