|
M. Kawamura et al., “Status and Recent Modifications to 324-MHz RF Source in J-PARC LINAC”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper TUPP070, pp. 587-589. |
|
F. Naito et al., “Study of the ACS Cavity Without a Bridge Cavity”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper TUPP073, pp. 596-598. |
|
T. Morishita et al., “High-Power Test Results of the RFQ III in J-PARC Linac”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper TUPP095, pp. 649-652. |
|
M. Otani et al., “Development of a Muon Linac for the G-2/EDM Experiment at J-PARC”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 1037-1041. |
|
T. Shibata et al., “LEBT Commissioning of the J-PARC LINAC”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 251-253. |
|
F. Naito et al., “Beam Commissioning of the i-BNCT Linac”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 760-762. |
|
T. Ito et al., “High Power Conditioning of the DTL for J-PARC”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper TUPAN058, pp. 1517-1519. |
|
T. Morishita et al., “The DTL/SDTL Alignment of the J-PARC Linac”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper TUPAN060, pp. 1523-1525. |
|
M. Sato et al., “Commissioning Status of the Linac for the iBNCT Project”, in Proc. 29th Linear Accelerator Conf. (LINAC'18), Beijing, China, Sep. 2018, pp. 174-176. |
|
T. Shibata et al., “Numerical and Experimental Study of H- Beam Dynamics in J-PARC LEBT”, in Proc. 29th Linear Accelerator Conf. (LINAC'18), Beijing, China, Sep. 2018, pp. 519-521. |