|
K. Saito et al., “R D of Nb/Cu Clad Seamless cavities at KEK”, in Proc. 10th Workshop RF Superconductivity (SRF'01), Tsukuba, Japan, Sep. 2001, paper PT019, pp. XX-XX. |
|
S. C. Joshi, V. Paramonov, A. Skassyrskaya, N. Hayashizaki, M. Ikegami, and Y. Yamazaki, “The Complete 3-D Coupled RF-Thermal-Structural -RF Analysis Procedure for A Normal Conducting Accelerating Structure for High Intensity Hadron Linac”, in Proc. 21st Linear Accelerator Conf. (LINAC'02), Gyeongju, Korea, Aug. 2002, paper MO475, pp. 216-218. |
|
N. Hayashizaki et al., “Structure Design of The Annular Coupled Structure Linac for The JAERI/KEK Joint Project”, in Proc. 21st Linear Accelerator Conf. (LINAC'02), Gyeongju, Korea, Aug. 2002, paper MO481, pp. 234-236. |
|
N. Hayashizaki, V. Paramonov, and Y. Yamazaki, “Power-Handling Capability of The Annular Coupled Structure Linac for The JAERI/KEK Joint Project”, in Proc. 21st Linear Accelerator Conf. (LINAC'02), Gyeongju, Korea, Aug. 2002, paper TH468, pp. 752-754. |
|
S. H. Kim et al., “Experience and Lessons in FRIB Superconducting Quarter-Wave Resonator Commissioning”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 646-649. |
|
H. T. Ren et al., “Commissioning Status of the FRIB Front End”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 813-816. |
|
H. Ao et al., “FRIB Driver Linac Integration to be ready for Phased Beam Commissioning”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 823-826. |
|
J. Wei et al., “The FRIB SC-Linac - Installation and Phased Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 12-20. |
|
K. Saito et al., “FRIB Solenoid Package in Cryomodule and Local Magnetic Shield”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 235-240. |
|
S. M. Shanab, K. Saito, and Y. Yamazaki, “Investigation of the Possibility of High Efficiency L-Band SRF Cavity for Medium-Beta Heavy Ion Multi-Charge-State Beams”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 1035-1037. |