|
D. Berkovits et al., “The 40 MeV Proton/Deuteron Linac at SARAF”, in Proc. 42nd ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'08), Nashville, TN, USA, Aug. 2008, paper WGE16, pp. 438-438. |
|
L. Weissman et al., “Installation and Commissioning of the Upgraded SARAF 4-rods RFQ”, in Proc. 61st ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'18), Daejeon, Korea, Jun. 2018, pp. 75-79. |
|
I. Eliyahu et al., “Control of the SARAF High Intensity CW Protron Beam Target Systems”, in Proc. 13th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'11), Grenoble, France, Oct. 2011, paper MOPMS008, pp. 336-338. |
|
L. Weissman et al., “First Experience at SARAF with Proton Beams using the Rutherford Scattering Monitor”, in Proc. 9th European Workshop on Beam Diagnostics and Instrumentation for Particle Accelerators (DIPAC'09), Basel, Switzerland, May 2009, paper TUPB20, pp. 208-210. |
|
D. Berkovits et al., “Operational Experience and Future Goals of the SARAF Linac at SOREQ”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper MO1A01, pp. 100-104. |
|
A. Shor, D. Berkovits, I. Fishman, A. Grin, B. Kaizer, and L. Weissman, “Performance of Beam Chopper at SARAF via RF Deflector Before the RFQ”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper THPB094, pp. 1038-1040. |
|
A. Kreisel et al., “SARAF Phase-I Proton / Deuteron Linac Beam Operation Status”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper WEIOB02, pp. 770-774. |
|
I. Mardor et al., “Status of the SARAF CW 40 MeV Proton/Deuteron Accelerator”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper FR5REP087, pp. 4981-4983. |
|
I. Mardor et al., “The SARAF CW 40 MeV Proton/Deuteron Accelerator”, in Proc. 14th Int. Conf. RF Superconductivity (SRF'09), Berlin, Germany, Sep. 2009, paper MOODAU04, pp. 74-80. |
|
A. Perry et al., “Saraf Superconducting module commissioning status”, in Proc. 14th Int. Conf. RF Superconductivity (SRF'09), Berlin, Germany, Sep. 2009, paper TUPPO029, pp. 263-267. |