|
I. Gertz, A. Abramson, I. Mardor, A. Perry, C. Piel, and L. Weissman, “Present Status of SARAF Control System”, in Proc. 12th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'09), Kobe, Japan, Oct. 2009, paper TUP109, pp. 334-336. |
|
A. Abramson, I. Gertz, I. Mardor, A. Perry, and C. Piel, “The National Instruments Based SARAF Main Control System”, in Proc. 12th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'09), Kobe, Japan, Oct. 2009, paper WEP085, pp. XX-XX. |
|
I. Mardor et al., “Status of the SARAF CW 40 MeV Proton/Deuteron Accelerator”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper FR5REP087, pp. 4981-4983. |
|
I. Mardor et al., “The SARAF CW 40 MeV Proton/Deuteron Accelerator”, in Proc. 14th Int. Conf. RF Superconductivity (SRF'09), Berlin, Germany, Sep. 2009, paper MOODAU04, pp. 74-80. |
|
A. Perry et al., “Saraf Superconducting module commissioning status”, in Proc. 14th Int. Conf. RF Superconductivity (SRF'09), Berlin, Germany, Sep. 2009, paper TUPPO029, pp. 263-267. |
|
J. Dumas et al., “SARAF beam commissioning results: injector, MEBT”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper TUPA172, pp. 1703-1705. |
|
A. Nagler et al., “The SARAF CW 40 MeV Proton/Deuteron Accelerator”, in Proc. 24th Linear Accelerator Conf. (LINAC'08), Victoria, Canada, Sep.-Oct. 2008, paper MO203, pp. 26-30. |
|
A. Bechtold et al., “The Status of the SARAF Linac Project”, in Proc. 25th Linear Accelerator Conf. (LINAC'10), Tsukuba, Japan, Sep. 2010, paper WE102, pp. 679-683. |