|
M. Comunian, F. Grespan, A. Palmieri, and A. Pisent, “The RFQ injector for the Radioactive Ion Beam of SPES Project”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper THPB043, pp. 951-953. |
|
A. Pepato et al., “Construction of the Modules of the IFMIF-EVEDA RFQ”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper MOPP087, pp. 257-260. |
|
A. Pisent, P. Colautti, and E. Fagotti, “MUNES a Compact Neutron Source for BNCT and Radioactive Wastes Characterization”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper MOPP088, pp. 261-263. |
|
A. Ponton et al., “ESS Normal Conducting Linac Status and Plans”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper THPP044, pp. 948-950. |
|
M. Comunian, F. Grespan, and A. Pisent, “ESS DTL Error Study”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper THPP086, pp. 1047-1049. |
|
F. Grespan, M. Comunian, A. Pisent, M. Poggi, C. R. Roncolato, and P. Mereu, “ESS DTL Design and Drift Tube Prototypes”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper THPP087, pp. 1050-1052. |
|
E. Fagotti et al., “The Couplers for the IFMIF-EVEDA RFQ High Power Test Stand at LNL: Design, Construction and Operation”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper TUPP093, pp. 643-645. |
|
M. Comunian, L. Bellan, F. Grespan, A. Pisent, M. Eshraqi, and R. Miyamoto, “Commissioning Plans for the ESS DTL”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 264-266. |
|
W. Wittmer et al., “European Spallation Source (ESS) Normal Conducting Front End Status Report”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 274-276. |
|
E. Khabibullina, L. Bellan, M. Comunian, A. Pisent, and A. D. Russo, “Beam Dynamic of Transport Line 1+ with New HRMS for the SPES Project”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 114-116. |