|
J. Ohnishi, A. Goto, M. Kase, and Y. Kotaka, “Study on Energy Upgrade and Beam Transmission Efficiencies for RIKEN K-70 AVF Cyclotron”, in Proc. 21th Int. Conf. on Cyclotrons and their Applications (Cyclotrons'16), Zurich, Switzerland, Sep. 2016, pp. 332-335. |
|
N. Sakamoto, N. Fukunishi, M. Kase, K. Suda, and K. Sekiguchi, “Acceleration of Polarized Deuteron Beams with RIBF Cyclotrons”, in Proc. 21th Int. Conf. on Cyclotrons and their Applications (Cyclotrons'16), Zurich, Switzerland, Sep. 2016, pp. 145-148. |
|
H. Imao et al., “Charge Stripper Ring for Cyclotron Cascade”, in Proc. 21th Int. Conf. on Cyclotrons and their Applications (Cyclotrons'16), Zurich, Switzerland, Sep. 2016, pp. 155-159. |
|
K. Yamada et al., “Status of the Superconducting Ring Cyclotron at RIKEN RI Beam Factory”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper THPP069, pp. 3518-3520. |
|
R. Koyama et al., “Beam Phase and RF Fields Monitoring System Using Lock-In Amplifier for RIBF”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper TUPC052, pp. 1173-1175. |
|
T. Nagatomo et al., “Current Developments for Increasing the Beam Intensities of the RIKEN 18-GHz Superconductiong ECR Ion Source”, in Proc. 21st Int. Workshop on ECR Ion Sources (ECRIS'14), Nizhny Novgorod, Russia, Aug. 2014, paper MOPPH007, pp. 57-60. |
|
T. Nagatomo, O. Kamigaito, M. Kase, T. Nakagawa, J. W. Stetson, and V. Tzoganis, “Four-Dimension Transverse Phase-Space Distribution Measured by a Pepper-Pot Emittance Meter”, in Proc. 22nd Int. Workshop on ECR Ion Sources (ECRIS'16), Busan, Korea, Aug.-Sep. 2016, pp. 124-127. |
|
H. Okuno et al., “Heavy Ion Accelerators for RIKEN RI Beam Factory and Upgrade Plans”, in Proc. 42nd ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'08), Nashville, TN, USA, Aug. 2008, paper WGE11, pp. 416-421. |
|
H. Okuno et al., “A New Possibility of Low-Z Gas Stripper for High-Power Uranium Beam Acceleration Alternative to C Foil”, in Proc. 46th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'10), Morschach, Switzerland, Sep.-Oct. 2010, paper THO2B01, pp. 600-604. |
|
K. Yamada et al., “Progress on the Commissioning of Radioactive Isotope Beam Factory at RIKEN Nishina Center”, in Proc. 11th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'09), Venice, Italy, Jun. 2009, paper MO-10, pp. 16-20. |