|
P. L. Till, P. Kolb, A. Schempp, J. S. Schmidt, and M. Vossberg, “Simulations of Buncher-cavities with Large Apertures”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper MOPD036, pp. 765-767. |
|
C. Zhang et al., “Front-End Linac Design and Beam Dynamics Simulations for MYRRHA”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper THPB005, pp. 849-851. |
|
M. Vossberg, H. Klein, H. Podlech, A. Schempp, C. Zhang, and A. Bechtold, “Test RFQ for the MAX Project”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper THPB047, pp. 960-962. |
|
C. Zhang et al., “Front-End Linac Design and Beam Dynamics Simulations for MYRRHA”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper THPLB03, pp. 813-815. |
|
D. M?ñder et al., “R&D of the 17 MeV MYRRHA Injector”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper MOPP064, pp. 202-204. |
|
G. Schreiber, E. Plechov, J. Salvatore, B. Schlitt, A. Schnase, and M. Vossberg, “First High Power Tests at the 325 MHz RF Test Stand at GSI”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 287-289. |
|
M. Okamura et al., “Beam Commissioning of the RFQ for the RHIC-EBIS Project”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper FR5REP046, pp. 4872-4874. |
|
N. Mueller et al., “Funneling with a Two Beam RFQ-Accelerator”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper FR5REP063, pp. 4917-4919. |
|
M. Vossberg, W. A. Barth, L. A. Dahl, N. Mueller, and A. Schempp, “The New GSI HLI-RFQ for CW-Operation”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper FR5REP064, pp. 4920-4922. |
|
J. G. Alessi et al., “Construction of the BNL EBIS Preinjector”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper MO6RFP025, pp. 407-409. |