JaCoW Logo

Reference Search

Author: J. G. Alessi


References



Reference
S. Y. Zhang et al., “Beam Induced Pressure Rise at RHIC”, in Proc. 21st Particle Accelerator Conf. (PAC'05), Knoxville, TN, USA, May 2005, paper TPAT095, pp. 4308-4310.
H. Huang et al., “Overcoming Weak Intrinsic Depolarizing Resonance with Energy-Jump”, in Proc. 17th Particle Accelerator Conf. (PAC'97), Vancouver, Canada, May 1997, paper 2V031, pp. 1460-1462.
A. Zaltsman et al., “Status of the EBIS Project at Brookhaven”, in Proc. 23rd Linear Accelerator Conf. (LINAC'06), Knoxville, TN, USA, Aug. 2006, paper TUP060, pp. 385-387.
C. Zhang et al., “The New EBIS RFQ for BNL”, in Proc. 24th Linear Accelerator Conf. (LINAC'08), Victoria, Canada, Sep.-Oct. 2008, paper MOP033, pp. 139-141.
J. G. Alessi et al., “Laser-Based Profile and Energy Monitor for H- Beams”, in Proc. 24th Linear Accelerator Conf. (LINAC'08), Victoria, Canada, Sep.-Oct. 2008, paper TUP092, pp. 615-617.
A. Zaltsman et al., “EBIS Preinjector Construction Status”, in Proc. 24th Linear Accelerator Conf. (LINAC'08), Victoria, Canada, Sep.-Oct. 2008, paper TUP120, pp. 685-687.
A. Zaltsman et al., “Commissioning of the EBIS-Based Heavy Ion Preinjector at Brookhaven”, in Proc. 25th Linear Accelerator Conf. (LINAC'10), Tsukuba, Japan, Sep. 2010, paper FR103, pp. 1033-1037.
J. G. Alessi et al., “Low and Medium Energy Beam Trasport Upgrade at BNL 200 MeV Linac”, in Proc. 25th Linear Accelerator Conf. (LINAC'10), Tsukuba, Japan, Sep. 2010, paper TUP026, pp. 455-457.
A. Zaltsman et al., “Commissioning of the IH Linac and High Energy Beam Transport of the EBIS Based Preinjector for RHIC”, in Proc. 25th Linear Accelerator Conf. (LINAC'10), Tsukuba, Japan, Sep. 2010, paper TUP033, pp. 470-472.
C. Zhang et al., “Beam Commissioning Results for the RFQ and MEBT of the EBIS Based Preinjector for RHIC”, in Proc. 25th Linear Accelerator Conf. (LINAC'10), Tsukuba, Japan, Sep. 2010, paper TUP034, pp. 473-475.


Back to the list