|
R. A. Baron et al., “ESS Beam Position and Phase Monitor System”, in Proc. 8th Int. Beam Instrumentation Conf. (IBIC'19), Malmö, Sweden, Sep. 2019, pp. 543-547. |
|
K. Kondo et al., “Radiation Measurement in the 1st Beam Commissioning Campaign of the LIPAc RFQ”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 964-967. |
|
F. Grespan et al., “ESS Drift Tube Linac Manufacturing, Assembly and Tuning”, in Proc. 12th Int. Particle Accelerator Conf. (IPAC'21), Campinas, Brazil, May 2021, pp. 1797-1800. |
|
F. Grespan et al., “IFMIF/EVEDA RFQ Beam Commissioning at Nominal 125 mA Deuteron Beam in Pulsed Mode”, in Proc. 11th Int. Particle Accelerator Conf. (IPAC'20), Caen, France, May 2020, pp. 21. |
|
D. C. Plostinar et al., “Status of the Normal Conducting Linac at the European Spallation Source”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 2019-2022. |
|
R. Miyamoto et al., “Beam Commissioning of Normal Conducting Part and Status of ESS Project”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 18-24. |
|
A. Pisent et al., “Design of a Linear Accelerator for Isotope Production”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 142-145. |
|
L. Neri et al., “HSMDIS Performance on the ESS Ion Source”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 863-865. |
|
K. Masuda et al., “Commissioning of IFMIF Prototype Accelerator Towards CW Operation”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 319-323. |
|
F. Grespan et al., “High Power RF Conditioning of the ESS DTL1”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 356-359. |