JaCoW Logo

Reference Search

Author: O. Brunner


References



Reference
M. Vretenar et al., “Status and Plans for Linac4 Installation and Commissioning”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 3332-3334.
F. Zimmermann et al., “Electrical Power Budget for FCC-ee”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 3828-3831.
E. Ciapala et al., “Commissioning of the 400 MHz LHC RF System”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper MOPP124, pp. 847-849.
F. Gerigk et al., “Choice of Frequency, Gradient, and Temperature for a Superconducting Proton Linac”, in Proc. 42nd ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'08), Nashville, TN, USA, Aug. 2008, paper WGE07, pp. 403-409.
L. Arnaudon, P. Baudrenghien, O. Brunner, and A. C. Butterworth, “Operation Experience with the LHC RF System”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper TUPEB056, pp. 1647-1649.
M. Vretenar et al., “Progress in the Construction of Linac4 at CERN”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper THPB010, pp. 864-866.
C. Rossi et al., “Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper THPP037, pp. 926-928.
N. Solyak et al., “Status of LHC Crab Cavity Cryostat”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TU5PFP034, pp. 894-896.
A. C. Butterworth et al., “First Beam Commissioning of the 400 MHz LHC RF System”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper WE5PFP074, pp. 2180-2182.
J. K. Chambrillon et al., “CERN SRF Assembling and Test Facilities”, in Proc. 15th Int. Conf. RF Superconductivity (SRF'11), Chicago, IL, USA, Jul. 2011, paper TUPO058, pp. 530-532.


Back to the list