JaCoW Logo

Reference Search

Author: O. Singh


References



Reference
A. Blednykh et al., “NSLS-II BPM System Protection from Rogue Mode Coupling”, in Proc. 24th Particle Accelerator Conf. (PAC'11), New York, NY, USA, Mar.-Apr. 2011, paper MOP192, pp. 450-452.
A. Blednykh et al., “NSLS-II Storage Ring BPM Button Development”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 748-750.
A. Blednykh et al., “Rogue Mode Shielding in NSLS-II Multipole Vacuum Chambers”, in Proc. 14th Beam Instrumentation Workshop (BIW'10), Santa Fe, NM, USA, May 2010, paper TUPSM033, pp. 194-198.
A. Caracappa, C. Danneil, A. J. Della Penna, R. P. Fliller, D. Padrazo, and O. Singh, “A PPS Compliant Stored Beam Current Monitor at NSLS-II”, in Proc. 5th Int. Beam Instrumentation Conf. (IBIC'16), Barcelona, Spain, Sep. 2016, pp. 426-429.
A. Caracappa, C. Danneil, R. P. Fliller, D. Padrazo, and O. Singh, “A PPS Compliant Injected Charge Monitor at NSLS-II”, in Proc. 5th Int. Beam Instrumentation Conf. (IBIC'16), Barcelona, Spain, Sep. 2016, pp. 422-425.
A. J. Della Penna, M. A. Maggipinto, J. Mead, O. Singh, and K. Vetter, “NSLSII Photon Beam Position Monitor ElectronicsTesting and Results”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper MOPF03, pp. 42-44.
B. N. Kosciuk et al., “Development of High Stability Supports for NSLS-II RF BPMs”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TH5RFP012, pp. 3465-3467.
B. N. Kosciuk, C. Hetzel, J. A. Kierstead, V. Ravindranath, S. K. Sharma, and O. Singh, “Development and Testing of Carbon Fiber Vacuum Chamber Supports for NSLS-II”, in Proc. 24th Particle Accelerator Conf. (PAC'11), New York, NY, USA, Mar.-Apr. 2011, paper TUP286, pp. 1364-1366.
B. Podobedov et al., “Single Micron Single-Bunch Turn-by-Turn BPM Resolution Achieved at NSLS-II”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 2095-2098.
D. Padrazo et al., “NSLS-II Injector System Diagnostics Update for LINAC Commissioning”, in Proc. 15th Beam Instrumentation Workshop (BIW'12), Newport News, VA, USA, Apr. 2012, paper TUPG019, pp. 173-176.


Back to the list