|
J. G. Alessi et al., “Upgrade of the AGS H- Linac (Oral Poster)”, in Proc. 1994 Linear Accelerator Conf. (LINAC'94), Tsukuba, Japan, Aug. 1994, paper MO-20, pp. 95-97. |
|
K. A. Brown et al., “RHIC Performance for FY10 200 GeV Au+Au Heavy Ion Run”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper MOPEC023, pp. 507-509. |
|
W. Fischer et al., “Status of the RHIC Head-on Beam-beam Compensation Project”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper MOPEC026, pp. 513-515. |
|
J. G. Alessi et al., “EBIS Preinjector Construction Status”, in Proc. 24th Linear Accelerator Conf. (LINAC'08), Victoria, Canada, Sep.-Oct. 2008, paper TUP120, pp. 685-687. |
|
J. G. Alessi et al., “Commissioning of the EBIS-Based Heavy Ion Preinjector at Brookhaven”, in Proc. 25th Linear Accelerator Conf. (LINAC'10), Tsukuba, Japan, Sep. 2010, paper FR103, pp. 1033-1037. |
|
D. Raparia et al., “Commissioning of the IH Linac and High Energy Beam Transport of the EBIS Based Preinjector for RHIC”, in Proc. 25th Linear Accelerator Conf. (LINAC'10), Tsukuba, Japan, Sep. 2010, paper TUP033, pp. 470-472. |
|
M. Okamura et al., “Beam Commissioning Results for the RFQ and MEBT of the EBIS Based Preinjector for RHIC”, in Proc. 25th Linear Accelerator Conf. (LINAC'10), Tsukuba, Japan, Sep. 2010, paper TUP034, pp. 473-475. |
|
J. G. Alessi et al., “Construction of the BNL EBIS Preinjector”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper MO6RFP025, pp. 407-409. |
|
H. Huang et al., “RHIC Polarized Proton Operation”, in Proc. 24th Particle Accelerator Conf. (PAC'11), New York, NY, USA, Mar.-Apr. 2011, paper MOOCN3, pp. 41-45. |
|
K. A. Drees et al., “Medium Energy Heavy Ion Operations at RHIC”, in Proc. 24th Particle Accelerator Conf. (PAC'11), New York, NY, USA, Mar.-Apr. 2011, paper THP054, pp. 2220-2222. |