|
J. P. Sikora, Y. Li, and S. De Santis, “Microwave Modeling for Electron Cloud Density Measurements at CesrTA”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1227-1229. |
|
T. A. Pelaia II et al., “Open XAL Status Report 2015”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1270-1272. |
|
Z. P. Li, L. Huang, Y. Li, J. Peng, and S. Wang, “Applications of Beam Parameter Measurements in Transport Lines at CSNS”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 3815-3817. |
|
Y. Li, Y. W. An, L. Huang, W. B. Liu, and S. Wang, “Beam-based Alignment Simulation on Transport Line of CSNS”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 3818-3820. |
|
A. Blednykh et al., “First Collective Effects Measurements in NSLS-II with ID's”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1332-1334. |
|
G. M. Wang et al., “NSLS-II Storage Ring Injection Optimization”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1968-1970. |
|
G. M. Wang et al., “Tools for NSLS II Commissioning”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1971-1973. |
|
G. M. Wang et al., “NSLS-II Storage Ring Insertion Device and Front-End Commissioning”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1974-1976. |
|
G. M. Wang, Y. Li, T. V. Shaftan, L. Yang, and L.-H. Yu, “NSLS-II Storage Ring Coupling Measurement and Correction”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1983-1985. |
|
R. P. Fliller et al., “Design of the NSLS-II Top Off Safety System”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1986-1988. |