|
E. M. Donegani et al., “The Beam Destinations for the Commissioning of the ESS High Power Normal Conducting Linac”, in Proc. HB'23 (HB), Geneva, Switzerland, Oct. 2023, paper FRC1I1, pp. 643-648. |
|
E. M. Donegani, I. Bustinduy, C. S. Derrez, T. J. Grandsaert, A. Rodr?¡guez P?íramo, and T. J. Shea, “Status of the Faraday Cups for the ESS linac”, in Proc. 8th Int. Beam Instrumentation Conf. (IBIC'19), Malmö, Sweden, Sep. 2019, pp. 205-208. |
|
E. M. Donegani, T. J. Grandsaert, T. J. Shea, and C. A. Thomas, “The Insertable Beam Stop in the ESS SPK Section”, in Proc. 9th Int. Beam Instrumentation Conf. (IBIC'20), Santos, Brazil, Sep. 2020, pp. 114-116. |
|
H. Hassanzadegan et al., “BCM System Optimization for ESS Beam Commissioning through the DTL Tank4”, in Proc. 12th International Beam Instrumentation Conference (IBIC'23), Saskatoon, Canada # e.g. "Barcelona, Spain" or "San Francisco, CA, USA", Sep. 2023, paper TUP038, pp. 277-280. |
|
H. Hassanzadegan et al., “Machine Protection Features of the ESS Beam Current Monitor System”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 2058-2060. |
|
H. Hassanzadegan, M. D. Donna, A. Jansson, H. Kocevar, T. J. Shea, and M. Werner, “Implementation Issues and First Results of the ESS Beam Current Monitor System”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 745-747. |
|
I. D. Kittelmann et al., “Beam Instrumentation Performance During Commissioning of the ESS Normal Conducting LINAC”, in Proc. 12th International Beam Instrumentation Conference (IBIC'23), Saskatoon, Canada # e.g. "Barcelona, Spain" or "San Francisco, CA, USA", Sep. 2023, paper TU1I02, pp. 136-141. |
|
I. Dolenc Kittelmann and T. J. Shea, “Simulations and Detector Technologies for the Beam Loss Monitoring System at the ESS Linac”, in Proc. 57th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'16), Malmö, Sweden, Jul. 2016, pp. 553-558. |
|
I. Dolenc Kittelmann et al., “Ionisation Chamber Based Beam Loss Monitoring System for the ESS Linac”, in Proc. 8th Int. Beam Instrumentation Conf. (IBIC'19), Malmö, Sweden, Sep. 2019, pp. 136-140. |
|
I. Dolenc Kittelmann et al., “Neutron Sensitive Beam Loss Monitoring System for the ESS Linac”, in Proc. 8th Int. Beam Instrumentation Conf. (IBIC'19), Malmö, Sweden, Sep. 2019, pp. 131-135. |