JaCoW Logo

Reference Search

Author: M. Kikuchi


References



Reference
M. Satoh et al., “Commissioning Status of SuperKEKB Injector Linac”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 4152-4154.
Y. Funakoshi et al., “Beam Commissioning of SuperKEKB”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 1019-1021.
N. Higashi et al., “Construction and Commissioning of Direct Beam Transport Line for PF-AR”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 2678-2680.
N. Iida et al., “Cancellation of the Leak Field from Lambertson Septum for the Beam Abort System in the SuperKEKB”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 2918-2921.
N. Iida et al., “Optics Design and Observation for the Beam Abort System in SuperKEKB HER”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 2922-2924.
T. Mimashi, N. Iida, M. Kikuchi, K. Kodama, T. Mori, and K. Abe, “Ceramic Chamber Used in SuperKEKB High Energy Ring Beam Abort System”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 2936-2938.
T. Mimashi et al., “Performance of SuperKEKB High Energy Ring Beam Abort System”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 2939-2942.
T. Mori et al., “Electron Beam Injection Septum”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 2943-2945.
S. Sakanaka et al., “Status of the Photon Factory”, in Proc. 4th Asian Particle Accelerator Conf. (APAC'07), Indore, India, Jan.-Feb. 2007, paper TUPMA028, pp. 142-144.
M. Yoshida et al., “Status of KEKB and Upgrade Plan to SuperKEKB”, in Proc. 4th Asian Particle Accelerator Conf. (APAC'07), Indore, India, Jan.-Feb. 2007, paper WEXMA01, pp. 280-284.


Back to the list