|
J. Teichert et al., “Pulsed Mode Operation and Longitudinal Parameter Measurement of the Rossendorf SRF Gun”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper MOPC081, pp. 262-264. |
|
H. Buettig et al., “16 kW Upgrade of the 1.3 GHz ELBE RF-system (CW) with Solid State Amplifiers”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper MOPC128, pp. 379-381. |
|
H. Buettig et al., “First Experience at ELBE with the New 1.3 GHz CWRF Power System Equipped with 10 kW GHz Solid State Amplifiers (SSPA)”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper THPPC053, pp. 3407-3409. |
|
H. Buettig et al., “Commissioning of the Upgraded Superconducting CW Linac ELBE”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper WEPME007, pp. 2935-2937. |
|
M. Justus et al., “Upgrade of the Machine Interlock System for the ELBE Accelerator Facility”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 469-471. |
|
H. Buettig et al., “Two Years Experience with the Upgraded ELBE RF System Driven by 20kW Solid State Amplifier Blocks (SSPA)”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 2257-2257. |
|
R. Steinbr??ck, M. Justus, M. Kuntzsch, T. Bergmann, and A. Kessler, “Trigger Generator for the Superconducting Linear Accelerator ELBE”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 46-48. |
|
J. Teichert et al., “First Operation Results of the Superconducting Photoinjector at ELBE”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper WEPP105, pp. 2755-2757. |
|
J. Teichert et al., “Status of the Superconducting RF Photo-Injector Development”, in Proc. 41st Advanced ICFA Beam Dynamics Workshop on Energy Recovery Linacs (ERL'07), Daresbury, UK, May 2007, paper 25, pp. 99-107. |
|
P. Michel et al., “Experiences with TESLA Cavities in CW-Operation at ELBE”, in Proc. 41st Advanced ICFA Beam Dynamics Workshop on Energy Recovery Linacs (ERL'07), Daresbury, UK, May 2007, paper 35, pp. 62-64. |