|
E. Rampnoux et al., “Design of 352.21 MHz RF Power Input Coupler and Window for the European Spallation Source Project (ESS)”, in Proc. 16th Int. Conf. RF Superconductivity (SRF'13), Paris, France, Sep. 2013, paper THP065, pp. 1069-1072. |
|
N. Gandolfo et al., “Deformation Tuner Design for a Double Spoke Cavity”, in Proc. 16th Int. Conf. RF Superconductivity (SRF'13), Paris, France, Sep. 2013, paper THP078, pp. 1104-1106. |
|
D. Reynet et al., “ESS Spoke Cryomodule and Test Valve Box”, in Proc. 17th Int. Conf. RF Superconductivity (SRF'15), Whistler, Canada, Sep. 2015, paper THPB109, pp. 1400-1404. |
|
M. Parise, P. Duchesne, D. Longuevergne, D. Passarelli, D. Reynet, and F. Ruiu, “Mechanical Design and Fabrication Aspects of Prototype SSR2 Jacketed Cavities”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 424-429. |
|
N. Gandolfo, S. Blivet, P. Duchesne, and D. Le Dr?®an, “Development and Performances of Spoke Cavity Tuner for MYRRHA Linac Project”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 667-670. |
|
A. Faus-Golfe et al., “Optics Design and Beam Dynamics Simulation for a VHEE Radiobiology Beam Line at PRAE Accelerator”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 3444-3447. |
|
A. Faus-Golfe et al., “The PRORAD Beam Line Design for PRAE”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 3448-3451. |
|
P. Duchesne, S. Blivet, G. Olivier, G. Olry, and T. P?®pin-Donat, “Alternative RF Tuning Methods Performed on Spoke Cavities for ESS and MYRRHA Projects”, in Proc. 12th Int. Particle Accelerator Conf. (IPAC'21), Campinas, Brazil, May 2021, pp. 1196-1199. |
|
C. Barbagallo et al., “Higher Order Modes Investigation in the PERLE Superconducting RF Cavity”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 731-734. |
|
M. Parise, P. Duchesne, D. Longuevergne, D. Passarelli, and V. Roger, “Fabrication Experience of the Pre-Production PIP-II SSR2 Cavities at Fermilab”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 529-532. |