|
D. T. Robinson et al., “LCLS-II Cryomodule and Cryogenic Distribution Control”, in Proc. 17th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'19), New York, NY, USA, Oct. 2019, pp. 1072. |
|
R. P. Stanek et al., “Overview of LCLS-II Project Status at Fermilab”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 302-306. |
|
J. Branlard et al., “Operating Experience with CC2 at Fermilab's SRF Beam Test Facility”, in Proc. 25th Linear Accelerator Conf. (LINAC'10), Tsukuba, Japan, Sep. 2010, paper THP029, pp. 818-820. |
|
W. Graves et al., “Results from CXLS commissioning”, in Proc. 15th Int. Particle Accelerator Conf. (IPAC'24), Nashville, TN, USA, May 2024, paper TUCN3, pp. 981-984. |
|
W. Graves et al., “Results from CXLS commissioning”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 557-562. |
|
V. Roger et al., “Optimization of static heat loads of the PIP-II cryomodules based on prototype HB650 cryomodule test results”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 695-698. |
|
T. Banaszkiewicz et al., “PIP-II linac cryogenic distribution system design challenges”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 840-842. |