|
M. Kireeff Covo et al., “Upgrade and Commissioning of the 88-Inch Cyclotron Final Power Amplifier”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper MOPC064, pp. 229-231. |
|
S. Kwiatkowski, K. M. Baptiste, J. Julian, M. E. Kennedy, and J. Miszczak, “Final Layout and Test Results of the Disconnect Switch for ALS Storage Ring RF System Power Supply”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper THPO036, pp. 3421-3423. |
|
J. N. Corlett et al., “Next Generation Light Source R&D and Design Studies at LBNL”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper TUPPP070, pp. 1762-1764. |
|
F. Sannibale et al., “Status of the APEX Project at LBNL”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper WEEPPB004, pp. 2173-2175. |
|
C. Steier et al., “Proposal for a Soft X-ray Diffraction Limited Upgrade of the ALS”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 567-569. |
|
F. Sannibale et al., “Status of the APEX Project at LBNL”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 727-729. |
|
H. J. Qian et al., “Design of a 1.3 GHz Two-cell Buncher for APEX”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 3924-3926. |
|
S. De Santis et al., “Injection/Extraction Kicker for the ALS-U Project”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 1977-1979. |
|
S. De Santis et al., “Multimodal Interaction in the ALS Longitudinal Feedback Kicker RF Cavity”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 2965-2967. |
|
G. J. Portmann et al., “Creating a Pseudo Single Bunch at the ALS ÔÇô First Results”, in Proc. 13th Beam Instrumentation Workshop (BIW'08), Lake Tahoe, CA, USA, May 2008, paper TUPTPF047, pp. 213-217. |