|
H. Ao et al., “Installation Progress on FRIB =0.041 Cryomodules Toward Beam Commissioning”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 1087-1089. |
|
J. Wei et al., “FRIB Project Status and Beam Instrumentation Challenges”, in Proc. 6th Int. Beam Instrumentation Conf. (IBIC'17), Grand Rapids, MI, USA, Aug. 2017, pp. 1-7. |
|
J. Wei et al., “FRIB Accelerator: Design and Construction Status”, in Proc. 13th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'15), Yokohama, Japan, Sep. 2015, paper MOM1I02, pp. 6-10. |
|
J. Wei et al., “The FRIB Superconducting Linac - Status and Plans”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. XX-XX. |
|
Y. Yamazaki et al., “Room Temperature Magnets in FRIB Driver Linac”, in Proc. North American Particle Accelerator Conf. (NAPAC'16), Chicago, IL, USA, Oct. 2016, pp. 188-190. |
|
I. N. Nesterenko, G. Bollen, M. Hausmann, A. Hussain, S. M. Lidia, and S. Rodriguez Esparza, “Optical System for Observation of FRIB Target”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 570-572. |
|
H. Ao et al., “FRIB Driver Linac Integration to be ready for Phased Beam Commissioning”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 823-826. |
|
J. Wei et al., “The FRIB SC-Linac - Installation and Phased Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 12-20. |
|
J. Wei et al., “Advances of the FRIB Project”, in Proc. 14th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'18), Lanzhou, China, Oct. 2018, pp. 7-12. |