|
A. Burrill et al., “BNL 703 MHz SRF Cryomodule Demonstration”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TU5PFP033, pp. 891-893. |
|
D. Kayran et al., “First Test Results from SRF Photoinjector for the R&D ERL at BNL”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 748-750. |
|
J. E. Tuozzolo et al., “Overview of Recent Studies and Modifications Being Made to RHIC to Mitigate the Effects of a Potential Failure to the Helium Distribution System”, in Proc. 24th Particle Accelerator Conf. (PAC'11), New York, NY, USA, Mar.-Apr. 2011, paper TUP225, pp. 1241-1243. |
|
R. Than et al., “Cryogenic System for the Energy Recovery Linac and Vertical Test Facility at BNL”, in Proc. 24th Particle Accelerator Conf. (PAC'11), New York, NY, USA, Mar.-Apr. 2011, paper TUP223, pp. 1235-1237. |
|
R. Than et al., “Cryogenic Vertical Test Facility for the SRF Cavities at BNL”, in Proc. 24th Particle Accelerator Conf. (PAC'11), New York, NY, USA, Mar.-Apr. 2011, paper TUP224, pp. 1238-1240. |
|
W. Xu et al., “BNL SRF Gun Commissioning”, in Proc. 16th Int. Conf. RF Superconductivity (SRF'13), Paris, France, Sep. 2013, paper MOP027, pp. 155-158. |
|
W. Xu et al., “Commissioning SRF Gun for the R&D ERL at BNL”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper WEPWO085, pp. 2492-2494. |
|
W. Xu et al., “Conditioning the Fundamental Power Coupler for ERL SRF Gun”, in Proc. 15th Int. Conf. RF Superconductivity (SRF'11), Chicago, IL, USA, Jul. 2011, paper TUPO010, pp. 371-373. |
|
W. Xu et al., “Design, Simulation and Conditioning of the Fundamental Power Couplers for BNL SRF Gun”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper WEPPC114, pp. 2489-2491. |
|
W. Xu et al., “First Beam Commissioning at BNL ERL SRF Gun”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1941-1943. |