JaCoW Logo

Reference Search

Author: A. Buechner


References



Reference
H. Buettig et al., “16 kW Upgrade of the 1.3 GHz ELBE RF-system (CW) with Solid State Amplifiers”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper MOPC128, pp. 379-381.
M. Kuntzsch et al., “Concept of Femtosecond Timing and Synchronization Scheme at ELBE”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper MOPO037, pp. 565-567.
H. Buettig et al., “First Experience at ELBE with the New 1.3 GHz CWRF Power System Equipped with 10 kW GHz Solid State Amplifiers (SSPA)”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper THPPC053, pp. 3407-3409.
P. A. McIntosh et al., “Completed Assembly of the Daresbury International ERL Cryomodule and its Implementation on ALICE”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper WEPPC031, pp. 2272-2274.
H. Buettig et al., “Commissioning of the Upgraded Superconducting CW Linac ELBE”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper WEPME007, pp. 2935-2937.
H. Buettig et al., “Two Years Experience with the Upgraded ELBE RF System Driven by 20kW Solid State Amplifier Blocks (SSPA)”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 2257-2257.
A. Buechner and B. Lange, “A New High-Dynamic Range BPM for ELBE with Integrated Differential Current Monitor (DCM)”, in Proc. 2nd Int. Beam Instrumentation Conf. (IBIC'13), Oxford, UK, Sep. 2013, paper MOPC22, pp. 104-107.
U. Lehnert, A. Buechner, B. Lange, R. Schurig, and R. Steinbr?â, “BPM Electronics for the ELBE Linear Accelerator - a Comparison”, in Proc. 5th Int. Beam Instrumentation Conf. (IBIC'16), Barcelona, Spain, Sep. 2016, pp. 75-77.
M. Kuntzsch et al., “Status of the Femtosecond Synchronization System at ELBE”, in Proc. 15th Beam Instrumentation Workshop (BIW'12), Newport News, VA, USA, Apr. 2012, paper MOBP03, pp. 12-14.
M. Kuntzsch, A. Buechner, T. Kirschke, U. Lehnert, and F. Roeser, “Future Timing and Synchronization Scheme at ELBE”, in Proc. 10th European Workshop on Beam Diagnostics and Instrumentation for Particle Accelerators (DIPAC'11), Hamburg, Germany, May 2011, paper MOPD31, pp. 116-118.


Back to the list