|
O. Capatina et al., “Cryostat for Testing HIE-ISOLDE Superconducting RF Cavities”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper MOPC103, pp. 313-315. |
|
J. K. Chambrillon et al., “CERN SRF Assembling and Test Facilities”, in Proc. 15th Int. Conf. RF Superconductivity (SRF'11), Chicago, IL, USA, Jul. 2011, paper TUPO058, pp. 530-532. |
|
F. Momal et al., “A Control Systembased on Industrial Components for Measuring and Testing the Prototype Magnets for LHC”, in Proc. 4th European Particle Accelerator Conf. (EPAC'94), London, UK, Jun.-Jul. 1994, pp. 2322-2325. |
|
V. Chohan et al., “Testing of the LHC Magnets in Cryogenic Conditions: Current Experience and Near Future Outlook”, in Proc. 9th European Particle Accelerator Conf. (EPAC'04), Lucerne, Switzerland, Jul. 2004, paper MOPLT014, pp. 560-562. |
|
V. Benda et al., “Conceptual Design of the Cryogenic System for the Large Hadron Collider LHC”, in Proc. 5th European Particle Accelerator Conf. (EPAC'96), Sitges, Spain, Jun. 1996, paper THO04A, pp. 361-363. |