|
D. K. Liu, W. X. Cheng, and Y. B. Leng, “SSRF TIMING SYSTEM”, in Proc. 2nd Asian Particle Accelerator Conf. (APAC'01), Beijing, China, Sep. 2001, paper TUP035, pp. XX-XX. |
|
D. Padrazo et al., “NSLS-II RF Beam Position Monitor- System Test and Integration”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper TUPF01, pp. 289-293. |
|
D. Teytelman et al., “Control and Measurements of Longitudinal Coupled-bunch Instabilities in the ATF Damping Ring”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper MOPAS067, pp. 584-586. |
|
E. B. Blum et al., “NSLS-II Injector Commissioning and Initial Operation”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1944-1946. |
|
G. M. Wang et al., “Beam Diagnostics using BPM Signals from Injected and Stored Beams in a Storage Ring”, in Proc. 24th Particle Accelerator Conf. (PAC'11), New York, NY, USA, Mar.-Apr. 2011, paper THP132, pp. 2369-2371. |
|
G. M. Wang et al., “NSLS II Booster Extended Integration Test”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1977-1979. |
|
G. M. Wang et al., “NSLS II Commissioning Tools”, in Proc. North American Particle Accelerator Conf. (NAPAC'13), Pasadena, CA, USA, Sep.-Oct. 2013, paper MOPHO17, pp. 276-278. |
|
G. M. Wang et al., “NSLS II Injector Integrated Testing”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper THPEA063, pp. 3285-3287. |
|
G. M. Wang et al., “NSLS-II Post Mortem Function Development and Data Analysis of Beam Dump”, in Proc. North American Particle Accelerator Conf. (NAPAC'16), Chicago, IL, USA, Oct. 2016, pp. 1039-1041. |
|
G. M. Wang et al., “NSLS-II Storage Ring Injection Optimization”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1968-1970. |