|
E. B. Blum et al., “NSLS-II Injector Commissioning and Initial Operation”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1944-1946. |
|
S. Seletskiy et al., “Commissioning of Active Interlock System for NSLS II Storage Ring”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1962-1964. |
|
W. X. Cheng, K. Ha, J. Mead, O. Singh, and G. M. Wang, “Measurements using Button BPM SUM Signal”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 377-379. |
|
B. Podobedov et al., “Single Micron Single-Bunch Turn-by-Turn BPM Resolution Achieved at NSLS-II”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 2095-2098. |
|
O. Singh et al., “NSLS-II BPM and Fast Orbit Feedback System Design and Implementation”, in Proc. 2nd Int. Beam Instrumentation Conf. (IBIC'13), Oxford, UK, Sep. 2013, paper TUBL1, pp. 316-322. |
|
W. X. Cheng et al., “NSLS2 Diagnostic Systems Commissioning and Measurements”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper MOIZB1, pp. 16-23. |
|
A. J. Della Penna, M. A. Maggipinto, J. Mead, O. Singh, and K. Vetter, “NSLSII Photon Beam Position Monitor ElectronicsTesting and Results”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper MOPF03, pp. 42-44. |
|
D. Padrazo et al., “NSLS-II RF Beam Position Monitor- System Test and Integration”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper TUPF01, pp. 289-293. |
|
J. Mead et al., “NSLS-II RF Beam Position Monitor Comissioning Update”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper WECYB2, pp. 500-504. |
|
W. X. Cheng et al., “Characterization of NSLS2 Storage Ring Beam Orbit Stability”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 625-629. |