JaCoW Logo

Reference Search

Author: K. Mernick


References



Reference
Q. Wu et al., “Beam Commissioning of the 56 MHz QW Cavity in RHIC”, in Proc. 17th Int. Conf. RF Superconductivity (SRF'15), Whistler, Canada, Sep. 2015, paper WEBA07, pp. 982-986.
Q. Wu et al., “56 MHz SRF System for SPHENIX Experiments at RHIC”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 562-565.
P. Thieberger et al., “The Dipole Corrector Magnets for the RHIC Fast Global Orbit Feedback System”, in Proc. 24th Particle Accelerator Conf. (PAC'11), New York, NY, USA, Mar.-Apr. 2011, paper THP064, pp. 2249-2251.
P. Thieberger et al., “High Intensity RHIC Limitations Due to Signal Heating of the Cryogenic BPM Cables”, in Proc. North American Particle Accelerator Conf. (NAPAC'13), Pasadena, CA, USA, Sep.-Oct. 2013, paper THPHO09, pp. 1319-1321.
P. Thieberger et al., “Conceptual Design of a High Precision Dual Directional Beam Position Monitoring System for Beam Crosstalk Cancellation and Improved Output Pulse Shapes”, in Proc. 15th Beam Instrumentation Workshop (BIW'12), Newport News, VA, USA, Apr. 2012, paper MOPG024, pp. 83-85.
P. Oddo et al., “RHIC Spin Flipper AC Dipole Controller”, in Proc. 24th Particle Accelerator Conf. (PAC'11), New York, NY, USA, Mar.-Apr. 2011, paper MOP203, pp. 474-476.
P. Oddo et al., “Dynamically Tuned High-Q AC-Dipole Implementation”, in Proc. 14th Beam Instrumentation Workshop (BIW'10), Santa Fe, NM, USA, May 2010, paper TUPSM070, pp. 338-340.
P. Bachek, T. Hayes, J. Mead, K. Mernick, G. Narayan, and F. Severino, “Development of a Timing and Data Link for EIC Common Hardware Platform”, in Proc. 19th International Conference on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'23), Cape Town, South Africa, Oct. 2023, paper MO4AO05, pp. 228-232.
N. Biancacci et al., “Transverse Impedance Measurement in RHIC and the AGS”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 1730-1732.
M. Wilinski et al., “Improvements for Operational Baseband Tune and Coupling Measurements and Feedback at RHIC”, in Proc. 14th Beam Instrumentation Workshop (BIW'10), Santa Fe, NM, USA, May 2010, paper TUPSM068, pp. 333-337.


Back to the list