|
J. Bernardini et al., “Strategies for mitigating residual magnetic field effect on pre-production PIP-II SSR2 cryomodule performance”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 187-190. |
|
J. Bernardini et al., “Integration of computer vision system to track the alignment SRF cavities into the test cryostat for PIP-II at Fermilab”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 191-194. |
|
C. Narug et al., “Standardization of ancillary installation tooling for SRF cavities at Fermilab”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 171-173. |
|
A. Sukhanov et al., “Cold test results of pre-production PIP-II SSR2 cavities with high-power couplers in the Fermilab Spoke Test Cryostat”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 161-163. |
|
V. Roger et al., “Optimization of static heat loads of the PIP-II cryomodules based on prototype HB650 cryomodule test results”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 695-698. |