|
A. Miura et al., “Installation and Performance Check of Beam Monitors for Energy Upgraded J-PARC Linac”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper THPP091, pp. 1059-1061. |
|
Y. Liu, T. Maruta, K. Futatsukawa, and A. Miura, “Studies on Wake Field in Annular Coupled Structure”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper TUPP072, pp. 593-595. |
|
T. Maruta et al., “Recent Progress of Beam Commissioning at J-PARC Linac”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper TUPP094, pp. 646-648. |
|
T. Shibata et al., “LEBT Commissioning of the J-PARC LINAC”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 251-253. |
|
F. Naito et al., “Beam Commissioning of the i-BNCT Linac”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 760-762. |
|
D. W. Stracener et al., “Holifield Radioactive Ion Beam Facility Status”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper FR5REP122, pp. 5068-5070. |
|
J. W. Xia, Y. Liu, and Y. J. Yuan, “HIRFL-CSR Facility”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TH1GRI01, pp. 3048-3052. |
|
D. Jeon et al., “The Laser Emittance Scanner for 1 GeV H- Beam”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TH5RFP099, pp. 3684-3686. |
|
V. V. Danilov, K. B. Beard, V. G. Dudnikov, R. P. Johnson, Y. Liu, and M. D. Shinn, “SNS Laser Stripping for H- Injection”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TU6RFP039, pp. 1629-1631. |
|
Y. Liu et al., “Laser Based Diagnostics for Measuring H- Beam Parameters”, in Proc. 24th Particle Accelerator Conf. (PAC'11), New York, NY, USA, Mar.-Apr. 2011, paper WEOCN1, pp. 1433-1437. |