|
J. C. Frisch et al., “Beam Measurements at LCLS”, in Proc. 13th Beam Instrumentation Workshop (BIW'08), Lake Tahoe, CA, USA, May 2008, paper MOIOTIO02, pp. 17-26. |
|
E. A. Medvedko et al., “Stripline Beam Position Monitors for LCLS”, in Proc. 13th Beam Instrumentation Workshop (BIW'08), Lake Tahoe, CA, USA, May 2008, paper TUPTPF037, pp. 190-193. |
|
E. A. Medvedko, R. G. Johnson, S. R. Smith, and G. R. White, “New Beam Monitoring Instrumentation at ATF2, KEK”, in Proc. 14th Beam Instrumentation Workshop (BIW'10), Santa Fe, NM, USA, May 2010, paper TUPSM027, pp. 173-176. |
|
A. Young, R. G. Johnson, R. M. Lill, and S. R. Smith, “LCLS Resonant Cavity Beam Position Monitors”, in Proc. 14th Beam Instrumentation Workshop (BIW'10), Santa Fe, NM, USA, May 2010, paper TUPSM028, pp. 177-181. |
|
S. R. Smith et al., “LCLS Cavity Beam Position Monitors”, in Proc. 9th European Workshop on Beam Diagnostics and Instrumentation for Particle Accelerators (DIPAC'09), Basel, Switzerland, May 2009, paper TUOC03, pp. 285-287. |
|
S. R. Smith, R. G. Johnson, and E. A. Medvedko, “LCLS Stripline BPM System Commissioning”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TH6REP036, pp. 4027-4029. |
|
S. R. Smith et al., “Commissioning and Performance of LCLS Cavity BPMs”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TU3GRC05, pp. 754-756. |
|
R. Akre et al., “LCLS Beam-Position Monitor Data Acquisition System”, in Proc. 11th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'07), Oak Ridge, TN, USA, Oct. 2007, paper WPPB40, pp. 478-480. |
|
P. H. Debenham et al., “The NIST-NRL Free-Electron Laser Facility”, in Proc. 13th Particle Accelerator Conf. (PAC'89), Chicago, IL, USA, Mar. 1989, pp. 775-780. |