|
K. M. Wilson et al., “Managing Procurements in the Time of Covid-19: SNS-PPU as a Case Study”, in Proc. 20th International Conference on RF Superconductivity (SRF'21), East Lansing, MI, USA, Jun.-Jul. 2021, pp. 863. |
|
C. Montag et al., “Design status of the Electron-Ion Collider”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper MOPA049, pp. 136-139. |
|
J. Wei et al., “FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives”, in Proc. 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper MOIAA01, pp. 1-8. |
|
M. Wiseman et al., “Commissioning of the CEBAF Cryomodules”, in Proc. 15th Particle Accelerator Conf. (PAC'93), Washington D.C., USA, Mar. 1993, pp. 841-844. |
|
P. Kneisel, M. Wiseman, and J. Susta, “Performance of a 1500 MHz Niobiuim Cavity with 2K-LHe Channel Cooling”, in Proc. 15th Particle Accelerator Conf. (PAC'93), Washington D.C., USA, Mar. 1993, pp. 1060-1063. |
|
K. Macha et al., “Alignment of CEBAF Cryomodules”, in Proc. 15th Particle Accelerator Conf. (PAC'93), Washington D.C., USA, Mar. 1993, pp. 2929-2932. |
|
R. Kazimi et al., “The 12-GeV CEBAF Upgrade Project”, in Proc. 23rd Linear Accelerator Conf. (LINAC'06), Knoxville, TN, USA, Aug. 2006, paper TU2001, pp. 218-218. |