JaCoW Logo

Reference Search

Author: M. Wiseman


References



Reference
K. Elliott et al., “First FRIB =0.041 Production Coldmass Build”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 541-543.
K. M. Wilson et al., “Managing Procurements in the Time of Covid-19: SNS-PPU as a Case Study”, in Proc. 20th International Conference on RF Superconductivity (SRF'21), East Lansing, MI, USA, Jun.-Jul. 2021, pp. 863.
K. Macha et al., “Alignment of CEBAF Cryomodules”, in Proc. 15th Particle Accelerator Conf. (PAC'93), Washington D.C., USA, Mar. 1993, pp. 2929-2932.
L. Merminga et al., “Beam Physics for the 12 GeV CEBAF Upgrade Project”, in Proc. 21st Particle Accelerator Conf. (PAC'05), Knoxville, TN, USA, May 2005, paper TPPP016, pp. 1482-1484.
M. A. Drury et al., “CEBAF Upgrade: Cryomodule Performance and Lessons Learned”, in Proc. 16th Int. Conf. RF Superconductivity (SRF'13), Paris, France, Sep. 2013, paper THIOB01, pp. 836-843.
M. A. Drury et al., “Overview of SNS Cryomodule Performance”, in Proc. 21st Particle Accelerator Conf. (PAC'05), Knoxville, TN, USA, May 2005, paper RPPE060, pp. 3496-3498.
M. A. Drury et al., “Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper MOPB030, pp. 237-239.
M. Drury et al., “CEBAF Cryomodule Commissioning in the South Linac”, in Proc. 6th Int. Conf. RF Superconductivity (SRF'93), Newport News, VA, USA, Oct. 1993, paper SRF93I07, pp. XX-XX.
M. Drury et al., “SNS Medium Beta Cryomodule Performance”, in Proc. 11th Workshop RF Superconductivity (SRF'03), Lübeck, Germany, Sep. 2003, paper TUP31, pp. 379-381.
M. J. Johnson et al., “Design of the FRIB Cryomodule”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper WEPPD006, pp. 2507-2509.


Back to the list